Cookies help us to understand how you use our website so that we can provide you with the best experience when you are on our site. To find out more, read our privacy policy and cookie policy.
Manage Cookies
A cookie is information stored on your computer by a website you visit. Cookies often store your settings for a website, such as your preferred language or location. This allows the site to present you with information customized to fit your needs. As per the GDPR law, companies need to get your explicit approval to collect your data. Some of these cookies are ‘strictly necessary’ to provide the basic functions of the website and can not be turned off, while others if present, have the option of being turned off. Learn more about our Privacy and Cookie policies. These can be managed also from our cookie policy page.
Strictly necessary cookies(always on):
Necessary for enabling core functionality. The website cannot function properly without these cookies. This cannot be turned off. e.g. Sign in, Language
Analytics cookies:
Analytical cookies help us to analyse user behaviour, mainly to see if the users are able to find and act on things that they are looking for. They allow us to recognise and count the number of visitors and to see how visitors move around our website when they are using it. Tools used: Google Analytics
Social media cookies:
We use social media cookies from Facebook, Twitter and Google to run Widgets, Embed Videos, Posts, Comments and to fetch profile information.
Share Water Tank for Bonnie Doon Lawn Irrigation System on FacebookShare Water Tank for Bonnie Doon Lawn Irrigation System on TwitterShare Water Tank for Bonnie Doon Lawn Irrigation System on LinkedinEmail Water Tank for Bonnie Doon Lawn Irrigation System link
Consultation has concluded
Consultation has concluded
Following recomendations based on the survey result, water tank installation has been complete.
Further works to install the lawn irrigation system will follow in early 2024.
Mansfield Shire Council has been working with the Bonnie Doon Community Reference Group on a lawn irrigation system near the Bonnie Doon War Memorial. From initial site investigation, the existing supply water pressure was found to need boosting to run the pop-up sprinklers reliably.
Proposal
To support the new irrigation system, Council is proposing to install a 27,400-litre water tank on the western side of public toilet in Bon Crescent.
The water tank will be finished in colourbond steel with a colour to closely match the existing public toilet. Following a site meeting with Community Reference Group members, an opportunity was identified to paint a mural on the tank (similar to “silo art”) with an iconic image of Bonnie Doon as a future project in consultation with community. The proposed positioning of the tank is shown in the photos below:
Consultation has concluded
Following recomendations based on the survey result, water tank installation has been complete.
Further works to install the lawn irrigation system will follow in early 2024.
Mansfield Shire Council has been working with the Bonnie Doon Community Reference Group on a lawn irrigation system near the Bonnie Doon War Memorial. From initial site investigation, the existing supply water pressure was found to need boosting to run the pop-up sprinklers reliably.
Proposal
To support the new irrigation system, Council is proposing to install a 27,400-litre water tank on the western side of public toilet in Bon Crescent.
The water tank will be finished in colourbond steel with a colour to closely match the existing public toilet. Following a site meeting with Community Reference Group members, an opportunity was identified to paint a mural on the tank (similar to “silo art”) with an iconic image of Bonnie Doon as a future project in consultation with community. The proposed positioning of the tank is shown in the photos below:
Water Tank for Bonnie Doon Lawn Irrigation System has finished this stage
This consultation is open for contributions from 14 July until 28 July 2023.
Under Review
Water Tank for Bonnie Doon Lawn Irrigation System has finished this stage
Contributions to this consultation are closed for evaluation and review. The project team will report back on key outcomes.
Final report
Water Tank for Bonnie Doon Lawn Irrigation System is currently at this stage
The final outcomes of the consultation are documented here. This may include a summary of all contributions collected as well as recommendations for future action.