High Street Service Lane Closure

Share High Street Service Lane Closure on Facebook Share High Street Service Lane Closure on Twitter Share High Street Service Lane Closure on Linkedin Email High Street Service Lane Closure link

Mansfield Shire Council is seeking community feedback on a proposed change to the High Street Service Road.

Council has received multiple concerns from residents regarding current traffic conditions. In particular, drivers are using the service road as a shortcut instead of the designated slip road to High Street / Maroondah Highway. This behaviour increases traffic volumes and affects safety and amenity for local residents.

These issues are especially noticeable during peak periods, including the winter ski season due to the increased number of visitors.

After past community consultation in October 2022 and investigation of options, Council is proposing to close the High Street Service Road at the Ultimo Street end.

Please review the proposed change in the supporting documents and provide your feedback through the survey.

This proposal has been developed in consultation with the Department of Transport and Planning.

Feedback closes 21 April 2026.

Mansfield Shire Council is seeking community feedback on a proposed change to the High Street Service Road.

Council has received multiple concerns from residents regarding current traffic conditions. In particular, drivers are using the service road as a shortcut instead of the designated slip road to High Street / Maroondah Highway. This behaviour increases traffic volumes and affects safety and amenity for local residents.

These issues are especially noticeable during peak periods, including the winter ski season due to the increased number of visitors.

After past community consultation in October 2022 and investigation of options, Council is proposing to close the High Street Service Road at the Ultimo Street end.

Please review the proposed change in the supporting documents and provide your feedback through the survey.

This proposal has been developed in consultation with the Department of Transport and Planning.

Feedback closes 21 April 2026.

  • High Street Service Lane Closure

    Share High Street Service Lane Closure on Facebook Share High Street Service Lane Closure on Twitter Share High Street Service Lane Closure on Linkedin Email High Street Service Lane Closure link

    The proposed works include:

    • Installing bollards at the Ultimo Street end to prevent through traffic
    • Converting the service road to two-way operation
    • Constructing a hammerhead turning area to allow service vehicles to turn safely
    • Installing new line marking and signage to improve traffic management

    The proposed changes aim to:

    • Reduce “rat-running” through local streets
    • Keep westbound winter traffic on High Street
    • Minimise the impact of ski-season traffic on residents
    • Improve safety and residential amenity for properties along High Street and Station Street

    Have your say

    Council invites residents, business owners, and road users to provide feedback on the proposal.

    Provide your feedback via the survey.

    The proposed works include:

    • Installing bollards at the Ultimo Street end to prevent through traffic
    • Converting the service road to two-way operation
    • Constructing a hammerhead turning area to allow service vehicles to turn safely
    • Installing new line marking and signage to improve traffic management

    The proposed changes aim to:

    • Reduce “rat-running” through local streets
    • Keep westbound winter traffic on High Street
    • Minimise the impact of ski-season traffic on residents
    • Improve safety and residential amenity for properties along High Street and Station Street

    Have your say

    Council invites residents, business owners, and road users to provide feedback on the proposal.

    Provide your feedback via the survey.

Page last updated: 09 Apr 2026, 03:43 PM